Artist Renderings:
A Greek inspired building with ten luxurious residences directly on the beach.
|
 |
 |
| Two Bedroom Unit: Eight well appointed units overlooking the white sand beach. |
 |
 |
Three Bedroom Penthouse: Two luxurious penthouse residences with expansive floor plans on two levels. |
 |
 |
Updates:
Click here to view updated construction photos as well as important project updates. |
 |
 |
Island Photos: Click here
to view delightful
pictures. |
 |
 |
Other Plans :
Click here to view parking garage plan, building plan etc.
|
 |
 |
|
| |
|
|
 |
| |
Architectural Drawings: |
Architectural drawings are expected to be completed by March 1, 2005 in order to apply for a building permit. Final building drawings are estimated to be completed by March 30, 2005 . |
| |
Building Permit Approval: |
Once the building permit application is turned in to VROM in early March, it is estimated that an approval will be given in two months. The developer anticipates having the permit by May 15, 2005.
The developer has already met with the head of VROM and discussed the project in order to get their feelings of the project and what requirements would be demanded.
In order to ensure that the new height restrictions from the airport would not be an issue, the developer had the Kadaster look in to this matter. Aqualina Beach Club is far enough from the end of the runway that this is not an issue.
|
| |
Preliminary Work: |
| Soil Test |
subsoil investigation was completed by G.T.S. N.V. (Geotechnical Related Engineering and Construction), a company affiliated with Independent Consulting Engineers N.V., in August 2004. |
| Site Survey |
A survey was completed in August 2004 by 3D Survey N.V. |
| Preparation |
Land has been cleared of trees and a temporary construction fence has been erected in early April 2005. |
| |
Estimated Completion Date: |
The project is expected to take fifteen (15) months to complete from breaking ground. It is therefore expected that owners will be able to take possession of their units by May 2008.
During the construction of the buidling, photos and updates may be viewed by going to the web site at www.aqualinaclub.com and clicking on the "Photos and Updates" tab on the left hand column on the home page. |
|
|